CE UK CA Stillages & Material Handling Solutions Manufactured in the UK

Project/Manufacturing Engineers with over 100 year experience

Experts in Process Management Providing Material Handling Solutions

We Deliver Throughout The United Kingdom

All Materials All Responsible Sourced

Our Fabricators are tested to BS EN 1090 Standards

Keeping Stillages in Prime Condition: Maintenance and Repair Best Practices

At Lowe Stillages & Cages, we understand the importance of maintaining stillages in optimal condition to ensure safety and compliance with PUWER regulations. In this blog post, we present a comprehensive guide on addressing maintenance and repair needs for stillages. By following these steps, employers can enhance safety, minimize risks, and prolong the lifespan of their stillage equipment.

  1. Establish a Maintenance Program: Develop a systematic maintenance program that outlines the frequency and scope of maintenance activities for stillages.
  2. Conduct Regular Inspections: Regularly inspect stillages for damage, wear, and deterioration of critical components. Address identified issues promptly to prevent hazards and equipment failures.
  3. Address Repairs Immediately: Promptly address maintenance and repair needs identified during inspections. Engage qualified personnel or authorised service providers for repairs.
  4. Document Maintenance and Repairs: Maintain detailed records of all maintenance and repair activities, documenting the date, nature of work, and personnel involved.
  5. Follow Manufacturer Guidelines: Adhere to manufacturer’s guidelines and recommendations for maintenance and repairs, including intervals, lubrication, and component replacement.
  6. Ensure Spare Parts Availability: Maintain an inventory of commonly used spare parts to facilitate timely repairs and minimise downtime.
  7. Train Personnel on Maintenance: Provide training to designated personnel on inspection techniques, maintenance procedures, and adherence to PUWER requirements.
  8. Periodic Load Testing: Consider periodic load testing to verify stillage structural integrity and load-bearing capacity.
  9. Implement Preventive Maintenance Measures: Incorporate preventive maintenance measures such as lubrication, rust prevention, and cleaning to optimise performance and longevity.
  10. Monitor and Evaluate Maintenance Program: Continuously monitor and evaluate the effectiveness of the maintenance program, seeking feedback and making adjustments as necessary.

By following these steps, employers can effectively address maintenance and repair needs for stillages, ensuring safety, compliance with PUWER regulations, and extended equipment lifespan. At Lowe Stillages & Cages, we prioritize the maintenance and reliability of stillages, enabling our customers to operate with confidence and efficiency.